Archives: Case Studies

Office strip-out Leeds

Responsible for stripping-out a 4th-floor office in Leeds with no lift access and ensuring all of the waste was tipped at fully licensed waste transfer stations within Leeds.

Bolton Railway Station

We were asked by a building contractor to strip out some redundant gas pipes and remove the back boards from a long disused advertising hoarding.

Frankie & Benny’s Leeds

As the main contractor, we ensured that the project was completed on time and within budget by a very small and dedicated team.